HOME

Bob's Bunker Page 54

This photo was taken after the concrete roof deck was poured. You can see some of the machinery which was lowered into the bunker prior to the pouring of the concrete roof deck. It is now December of 2012 and there is a layer of snow sitting on the concrete roof deck outside. Construction outside has been haulted until spring of 2013 arrives.
<<Previous Page Next Page>>